Situation:
The client, a nationwide reseller of ladies fashion shoes, needed
to upgrade their online store to improve access time for customers,
make the process of ordering easier and become more productive.
The customer had a web site that had become so successful they were
looking to upgrade and improve the existing system to allow for
new business and more customers. The web site was developed by an
external web design company. The server specifications, security
and configurations were designed by Signal Networks, with hosting
provided at a managed facility supported by Signal Networks. The
client insisted that the servers must be live at all times and in
the event of an outage then a failover server should take over to
serve customer requests.
Requirements:
- No downtime with the move.
- Windows server with an SQL backend database.
- SQL database must be redundant.
- Server must be remotely accessible for administration and
site upgrades.
Resolution:
Two servers were installed with Windows 2003 operating
systems. The web site was configured to run on IIS 6 in load balanced
mode to utilise the full potential of both servers and bandwidth.
One server was installed and configured, the server
was then stress tested and security scanned by Signal Networks,
after this the customer tested the site to make sure it functioned
in the same way as the existing site. Once this was confirmed the
DNS was switched over and the new server was live freeing up the
old server to become the failover load balanced pairing.
The SQL server was then installed using a shared
database configuration on the primary server. In the event of a
failure the secondary server would then become the live database.
Two firewalls were secured and configured to provide
fail over and redundancy. VPN tunnels were added back to the Head
Office to provide stock management and image manipulation. The firewalls
were also configured to allow secure remote access to the servers
by the web design company.